• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Bracken nature reserve awarded five-star rating for green building

Bracken nature reserve awarded five-star rating for green building

21 July 2023 by Pearlmar

Bracken nature reserve awarded five-star rating for green building

The Bracken Nature Reserve Visitor Education Centre in Cape Town has been awarded a five-star rating from the Green Building Council of South Africa (GBCSA) for its public and education building design.

This comes after plans to redevelop its historic buildings into a community multipurpose venue made with an industrial-type steel portal frame, brick infill walls and a facade that will be a combination of face brick and plaster. 

The City of Cape Town’s Acting Mayor and Mayoral Committee Member for Spatial Planning and Environment, Eddie Andrews, said the recognition from the GBCSA signifies that the building design has met stringent environmental standards and demonstrated a high level of sustainability. 

Andrews congratulated the team for coming up with such an innovative redesign.

“This is a fantastic achievement for the city. It shows the city’s commitment to reducing environmental impact, promoting access to efficient facilities, and leading by example in project planning and green building design,” Andrews said.

He said the design of the centre’s features support the city’s goal for all new and existing municipal buildings to be net-zero carbon by 2030, as outlined in the City’s Climate Change Action Plan.

The centre is also designed to encourage alternative modes of transport to reduce greenhouse gas emissions and foster healthier lifestyles.

The project, which is scheduled to start in October 2023 and planned for completion in July 2025, will be able to accommodate up to 100 visitors simultaneously, whereas the old building could only accommodate small groups of 20 people at a time.

The sustainable building features of the redeveloped centre will include:

•    Lighting that uses a motion sensor-controlled system and LED-efficient fittings;

•    High-performance internal vision glazing designed to take advantage of natural daylight;

•    Mechanically assisted fresh air ventilation systems that will filter fresh air to enclosed offices and multipurpose venue, using weather louvres and occupancy sensors;

•    50kWp (Kilowatt peak) Photovoltaic grid-tied system with two 25kVA (Kilo-volt-amperes) inverters;

•    3kW backup element for 200-litre solar geyser;

•    Rainwater harvesting;

•    Waste recycling storage facilities for sorting and collecting operational waste; and

•    Black water treatment system and black water harvesting system.

Andrews highlighted that water-efficient fittings will be fitted onto all taps, waterless urinals will be installed, and toilets will be flushed using recycled water from the black water harvesting system.

He said there was no requirement for landscaped irrigation and the local weather-wise indigenous ground cover, plant and tree species, will be watered during the winter months’ natural rainfall.

“Access to water and energy consumption data by means of display screens for all occupants and visitors. This will offer insight into the sustainable operations of the building,” Andrews said.

“Preferential parking bays have been allocated for fuel-efficient transportation, and secure bicycle storage provided. There are also cyclist facilities including showers and lockers on site,” the Acting Mayor said. – SAnews.gov.za

 

 

GabiK
Fri, 07/21/2023 – 13:27

The Bracken Nature Reserve Visitor Education Centre in Cape Town has been awarded a five-star rating from the Green Building Council of South Africa (GBCSA) for its public and education building design.

This comes after plans to redevelop its historic buildings into a community multipurpose venue made with an industrial-type steel portal frame, brick infill walls and a facade that will be a combination of face brick and plaster. 

The City of Cape Town’s Acting Mayor and Mayoral Committee Member for Spatial Planning and Environment, Eddie Andrews, said the recognition from the GBCSA signifies that the building design has met stringent environmental standards and demonstrated a high level of sustainability. 

Andrews congratulated the team for coming up with such an innovative redesign.

“This is a fantastic achievement for the city. It shows the city’s commitment to reducing environmental impact, promoting access to efficient facilities, and leading by example in project planning and green building design,” Andrews said.

He said the design of the centre’s features support the city’s goal for all recent and existing municipal buildings to be net-zero carbon by 2030, as outlined in the City’s Climate Change Action Region.

The centre is also designed to encourage alternative modes of transport to reduce greenhouse gas emissions and foster healthier lifestyles.

The project, which is scheduled to start in October 2023 and planned for completion in July 2025, will be able to accommodate up to 100 visitors simultaneously, whereas the worn building could only accommodate small groups of 20 people at a time.

The sustainable building features of the redeveloped centre will include:

•    Lighting that uses a motion sensor-controlled scheme and LED-efficient fittings;

•    High-performance internal vision glazing designed to seize advantage of natural daylight;

•    Mechanically assisted fresh air ventilation systems that will filter fresh air to enclosed offices and multipurpose venue, using weather louvres and occupancy sensors;

•    50kWp (Kilowatt peak) Photovoltaic grid-tied scheme with two 25kVA (Kilo-volt-amperes) inverters;

•    3kW backup element for 200-litre solar geyser;

•    Rainwater harvesting;

•    Waste recycling storage facilities for sorting and collecting operational waste; and

•    Black water treatment scheme and black water harvesting scheme.

Andrews highlighted that water-efficient fittings will be fitted onto all taps, waterless urinals will be installed, and toilets will be flushed using recycled water from the black water harvesting scheme.

He said there was no requirement for landscaped irrigation and the local weather-wise indigenous ground cover, plant and tree species, will be watered during the winter months’ natural rainfall.

“Access to water and energy consumption data by means of display screens for all occupants and visitors. This will offer insight into the sustainable operations of the building,” Andrews said.

“Preferential parking bays believe been allocated for fuel-efficient transportation, and secure bicycle storage provided. There are also cyclist facilities including showers and lockers on site,” the Acting Mayor said. – SAnews.gov.za

Read More at the Source

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: MyPR, News, Public Relations

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Fun South African fact

    Dear Editor Fun South African fact: towns like Franschhoek and Stellenbosch are home to world-class wine farms set in stunning, scenic surroundings. Regards Aressa Smith In Response to/From: Luxury Properties Seized in New Lottery Crackdown

    27 January 2026
  • Condolences on the Passing of Lusanda Dumke

    Statement by Leander Kruger MPL – DA Buffalo City Constituency Leader: The Democratic Alliance in Buffalo City Metropolitan Municipality mourns the passing of Springbok Women’s rugby player and Mdantsane trailblazer, Lusanda Dumke, who lost her battle with cancer at the age of 28. South Africa has lost an exceptional athlete, a leader, and a source…

    17 December 2025
  • Rape Kits Delivered, But…

    Statement by Nicholas Gotsell MP – DA NCOP Member on Security & Justice: The DA can confirm that 2 840 rape kits arrived in Cape Town on Monday, following sustained DA oversight and pressure after multiple police stations across the Western Cape were found to be without this critical forensic evidence tool. While this delivery…

    17 December 2025

About Pearlmar

Previous Post:SIU mulling legal options following Telkom court decision
Next Post:Right place – right time

Reader Interactions

Comments

  1. feral filly

    21 July 2023 at 2:52 pm

    Greenland: You have two cows. They are in for a surprise.

  2. Boost

    21 July 2023 at 2:51 pm

    Van der Merwe is approached by SANRAL one day who want to build a new highway through his donkey farm. Van is really concerned with how his donkeys can get from one side of the farm to the other without having to cross the highway and risk being injured or killed. He is promised that they will build bridges the highway so that his donkeys can cross under the highway. Van agrees and gives them the go-ahead.

    The highway is built and a year later the same rep goes to the farm to go see how Van and his donkeys are. He eventually finds Van under one of these bridges chipping away at the roof of the tunnel with a hammer and chisel.

    \”Mnr Van de Merwe, what are you doing damaging the highway bridge?\”

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Reach Trust