• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Good Progress Being Made at the Van Schoorsdrift Interchange

Good Progress Being Made at the Van Schoorsdrift Interchange

2 October 2025 by Guest

The Western Cape Department of Infrastructure (DOI) is pleased to announce that good progress is being made on the new Van Schoorsdrift Interchange approximately 4.5km north of the Potsdam Interchange on the N7. This is part of a broader project to upgrade about 10km of the N7 to freeway standards.

A new 5km road (MR244) will be built to link Vissershok Road (OP72) with a future road to be called Berkshire Boulevard (OP72) from a point just west of the Malanshoogte Road/ Contermanskloof Road. This will require the construction of five new bridges, including the Van Schoorsdrift Interchange bridge over the N7 currently under construction and a bridge over the Diep River.

“This 36-month project, which started in March 2024 and comes at a cost of over R780 million, entails the construction of a single carriageway road, approximately 5km in length, with a narrow diamond interchange on the N7, a bridge over the Diep River, and an additional four bridges to accommodate the safe movement of crossing traffic,” said Jandré Bakker, DOI Director: Operational Support.

“The project is still on track to be completed by the end of the first quarter of 2027 with expenditure at and progress currently at between 49 and 50%,” he continued. “The new link will form part of a high order road between the West Coast and Durbanville. The existing weighbridge facility will be relocated further north to provide a safe weaving distance between the new interchange N7 northbound on-ramp and the off-ramp to the weighbridge,” Bakker added.

“The specific objective of this project is to improve the safety of road users by upgrading this part of the N7 to freeway standards,” said Provincial Minister Tertuis Simmers. “This requires the closure of five at-grade intersections on the N7 between Potsdam Interchange and Melkbos Interchange. This is the only section of the N7 between Goodwood and Malmesbury that does not currently comply with freeway standards,” the Minister said.

Van Schoorsdrif Road/ Old Malmesbury Road (DR1111) will be realigned for access to Vissershok Road. Four of the new bridges will link farmlands and City of Cape Town land which are bisected by the realigned Vissershok and Van Schoorsdrif Roads. Streetlighting will be installed on the interchange bridge and along the N7 from Potsdam Interchange to Melkbos Interchange.

“This project is set to create 280 work opportunities of which we have already achieved 251. Other contract participation goals we set include 24 local enterprises of which we already achieved 15, and 10 emerging contractors of which 4 are already involved,” the Minister continued.

As with all construction projects, there will be some inconvenience to road users who have already felt it with the closure of the Vissershok road connection to the N7, but this large capital investment will bring long-term benefits for the development of the Western Cape,” concluded Provincial Minister Simmers.

The five at-grade intersections on the N7 to be closed for the upgrade to freeway standards are:

  • Vissershok Road (OP111) which has been closed and de-proclaimed.
  • Klein Vissershok Road (OP89).
  • Frankdale Road (OP47), which provides access to the City of Cape Town landfill site.
  • Van Schoorsdrif access to the Old Malmesbury Road (DR1111).
  • Morningstar Road (MR215).

Traffic signals will be installed at the intersections at the ramp terminals on the Van Schoorsdrift Interchange bridge to facilitate safe entry and exit from the N7.

The relocated weighbridge facility will include the installation of weigh-in-motion facilities in both the northbound and southbound directions of the N7.

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: Cape Town

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Congratulations to the Lotto Winner

    Dear Editor Dear Editor, I was thrilled to hear about the R8.5 million Lotto win for the community of Gqeberha. Such life-changing news brings hope and excitement to everyone in the area. I congratulate the winner and wish them all the best with their prize. May this bring positive change to their life and the…

    1 October 2026
  • Opinion on Lotto Winner News

    Dear Editor Congratulations to the lucky winner! This is truly wonderful news for the community. Regards Marina Adams In Response to/From: Congratulations to the Lucky Winner

    1 October 2026
  • Regarding Lotto Winner Story

    Dear Editor Congratulations to the winner, this is wonderful news for the community. Wishing them the best for the future. Regards Willem Pieterse In Response to/From: Re: R8.5 Million Lotto Winner Claims Prize in Gqeberha

    27 September 2026

About Guest

Previous Post:Quarter-Final Spots up for Grabs
Next Post:Smarter Mobility Africa 2025: Shaping the Future of Transport through Technology and Collaboration

Reader Interactions

Comments

  1. Saint La-Z-Boy

    7 September 2026 at 7:01 pm

    Ja, Nee – Yes, NoOften used in succession, these two words are used to express agreement or confirmation with someone or something.Example: “Ja, Nee, I’m fine thanks.”

  2. Rocky Highway

    7 September 2026 at 8:36 am

    Eina! – ouch! [Ay-na] Usually expressed when someone experiences a sharp pain of some sort.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online