• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / About That Bayside Canal Upgrade in Milnerton

About That Bayside Canal Upgrade in Milnerton

2 June 2025 by Guest

The City of Cape Town’s Water and Sanitation Directorate remains committed to completing the multi-million rand Bayside Canal upgrade in Milnerton. Work on site was temporarily suspended in November 2024 due to a contractual dispute with the appointed contractor. Efforts are currently under way to resolve the matter and resume construction.

The City is committed to reaching a negotiated, amicable settlement of the dispute so that work can continue on site. To date, approximately 55% of the project has been completed.

‘It is important that public funds are used responsibly and for this reason, the negotiations are being dealt with as quickly and thoughtfully as possible. This is one of the City’s crucial investments which will contribute to improved water quality within Rietvlei and surrounds. Given ongoing development in the catchment, the upgrade is essential to accommodate increased stormwater flow during peak rainfall and to tackle the significant litter and pollution that enters Rietvlei via the stormwater system,’ said the City’s Mayoral Committee Member for Water and Sanitation, Councillor Zahid Badroodien.

In the interim, the City has taken steps to mitigate flood risks in the area. Following heavy rainfall on 8 April 2025, which led to flooding along Blaauwberg Road, the canal adjacent to the road and approximately 30 metres of the Bayside Canal were cleared to improve stormwater flow ahead of the winter season.

Additional works were also undertaken during the suspension period. On 24 April 2025, the contractor removed the temporary berm and bypass trench, in line with contractual obligations, to assist with drainage.

The City conducted an inspection on 27 April 2025 where it was determined that the water level at the control weir was at about 2,1m and 0,9m in the Rietvlei. A slight drop in water levels since 8 April 2025 suggests a blockage between the lower section of the proposed bypass canal and Rietvlei. To address this, the City will, through its repair and maintenance contractors survey the existing flow channel to determine current water levels and the location of the obstruction, deploy a long-boom excavator to clear the blockage and stockpile the excavated material adjacent to the channel.

Once work starts again, the stormwater canal to the primary sedimentation ponds and the bypass canal from the secondary treatment channel to the Rietvlei will be constructed.

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: Cape Town

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Older Persons Grants Land Today — No Need to Queue at Dawn

    Dear Editor, Older Persons grants are paid today, 30 October, under SASSA’s revised November payment schedule — with disability grants on Monday 2 November, children’s grants on Tuesday 3 November, and grants under review on Thursday 5 November. Two things every beneficiary should know. First, grant money does not expire on payment day. It stays…

    30 October 2026
  • November Grants Pay Early – No Need to Queue at Dawn

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. November grants pay earlier than usual. Older Persons grants are paid on Friday 30 October, Disability grants on 2 November, and Child Support and other grants on 3 November. Grants still under review are paid on 5 November. The money…

    27 October 2026
  • NSFAS 2027 applications close on 31 October — SASSA households, apply now

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. NSFAS applications for the 2027 academic year close on Friday 31 October 2026, and no extension is expected. If your household receives a SASSA grant, your child already passes the NSFAS financial eligibility test — but they still have to…

    25 October 2026

About Guest

Previous Post:The World Is Calling Cape Town
Next Post:Six Arrested for Philippi East Sexual Assault

Reader Interactions

Comments

  1. AlertXis

    29 August 2026 at 7:26 am

    Finland: You have two cows. They are more likely than your entire country to commit a crime.

  2. Wonder Lady

    27 August 2026 at 7:46 pm

    USA: You have two cows. You outsource a farm to milk them and sell the milk to those who can afford it. You then use the profit to buy someone else\’s cow for your butcher to make steak with.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online