• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Interventions to stabilise water supply in Durban South Coast areas

Interventions to stabilise water supply in Durban South Coast areas

28 March 2024 by Guest

Interventions to stabilise water supply in Durban South Coast areas

The eThekwini Metropolitan Municipality says the city is working around the clock to stabilise water supply in areas that are supplied through the South Coast Augmentation (SCA) pipeline.

The municipality said the system has been struggling to recover and maintain healthy levels to supply dependent reservoirs following the completion of repairs on a section of the 1200mm diameter SCA steel trunk main. 

The trunk main underwent repairs after it was damaged by heavy rains.

The municipality said the city is building up storage at the Woodlands 3 and 4 Reservoirs by managing demand at the SCA pumpstation. 

“Managing demands involve rationing supply to different reservoirs and switching off the booster pumpstations to allow reservoirs to recover. With this intervention, Woodlands 3 and 4 reservoirs have improved, with levels going from being empty to currently sitting at 30%. 

“The city aims to reach 80% storage levels to be able to maintain pumping to the Amanzimtoti Waterworks to supply all dependent reservoirs that are located downstream from the Waterworks,” the municipality said.

The affected areas include Amanzimtoti CBD, Almond, Kingsburgh, Doonside, Illovo Beach, Panorama Park, Umgababa, Mgobhozini, Mfume, KwaSoni, Mshiwase, Nkwali, Lovu, Bhekulwandle, KwaMakhutha, Mkhazini, Ezimbokodweni, KwaFakazi, KwaMgendwa, Mahlathini, Ohlongeni, eKuphileni, Adams Mission, Umnini, Danganyana, Magabheni, Dlambula, Ehlanzeni, Thoyane, Umkomaas, Clansthal, Craigeburn, Amahlongwa, Amalundi, Crowder Farm, Malukazi, and Scottburgh.

Construction of retaining walls underway

Meanwhile, a team from the city is hard at work building the retaining walls along Sinamuva Road in Inanda Newtown extension B, Ward 107.

This follows recent heavy rain, which exposed the main water pipe and damaged the roadside wall.

The city said the installation of retaining walls will increase safety measures for the community using Sinamuva Road in Ward 107.

 As part of remedial efforts, the team is securing the water main pipe and protecting the road from soil erosion. 

City’s Project Foreman, who is providing strategic direction to ensure the work is done in accordance with job specifications, Bongani Shabalala, said the project started in December last year. 

“Part of the work includes placing gabions to protect against soil erosion. A previous storm severely damaged the side wall, and other parts of the road were affected,” Shabalala said. 

Resident Siboniso Mpanza, who is working on the project, said the repair work has created job opportunities for locals. 

“Most of the workers here are the youth who are learning new skills. We will continue to use these skills gained even after the project is completed,” said Mpanza. – SAnews.gov.za

 

 

GabiK
Thu, 03/28/2024 – 08:45

84 views

The eThekwini Metropolitan Municipality says the city is working around the clock to stabilise water supply in areas that are supplied through the South Coast Augmentation (SCA) pipeline.

The municipality said the system has been struggling to recover and maintain healthy levels to supply dependent reservoirs following the completion of repairs on a section of the 1200mm diameter SCA steel trunk main. 

The trunk main underwent repairs after it was damaged by heavy rains.

The municipality said the city is building up storage at the Woodlands 3 and 4 Reservoirs by managing demand at the SCA pumpstation. 

“Managing demands involve rationing supply to different reservoirs and switching off the booster pumpstations to allow reservoirs to recover. With this intervention, Woodlands 3 and 4 reservoirs have improved, with levels going from being empty to currently sitting at 30%. 

“The city aims to reach 80% storage levels to be able to maintain pumping to the Amanzimtoti Waterworks to supply all dependent reservoirs that are located downstream from the Waterworks,” the municipality said.

The affected areas include Amanzimtoti CBD, Almond, Kingsburgh, Doonside, Illovo Beach, Panorama Park, Umgababa, Mgobhozini, Mfume, KwaSoni, Mshiwase, Nkwali, Lovu, Bhekulwandle, KwaMakhutha, Mkhazini, Ezimbokodweni, KwaFakazi, KwaMgendwa, Mahlathini, Ohlongeni, eKuphileni, Adams Mission, Umnini, Danganyana, Magabheni, Dlambula, Ehlanzeni, Thoyane, Umkomaas, Clansthal, Craigeburn, Amahlongwa, Amalundi, Crowder Farm, Malukazi, and Scottburgh.

Construction of retaining walls underway

Meanwhile, a team from the city is hard at work building the retaining walls along Sinamuva Road in Inanda Newtown extension B, Ward 107.

This follows recent heavy rain, which exposed the main water pipe and damaged the roadside wall.

The city said the installation of retaining walls will increase safety measures for the community using Sinamuva Road in Ward 107.

 As part of remedial efforts, the team is securing the water main pipe and protecting the road from soil erosion. 

City’s Project Foreman, who is providing strategic direction to ensure the work is done in accordance with job specifications, Bongani Shabalala, said the project started in December last year. 

“Part of the work includes placing gabions to protect against soil erosion. A previous storm severely damaged the side wall, and other parts of the road were affected,” Shabalala said. 

Resident Siboniso Mpanza, who is working on the project, said the repair work has created job opportunities for locals. 

“Most of the workers here are the youth who are learning new skills. We will continue to use these skills gained even after the project is completed,” said Mpanza. – SAnews.gov.za

Read More at the Source

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: 2024, Durban, new, SA News, Steel, Water

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Older Persons Grants Land Today — No Need to Queue at Dawn

    Dear Editor, Older Persons grants are paid today, 30 October, under SASSA’s revised November payment schedule — with disability grants on Monday 2 November, children’s grants on Tuesday 3 November, and grants under review on Thursday 5 November. Two things every beneficiary should know. First, grant money does not expire on payment day. It stays…

    30 October 2026
  • November Grants Pay Early – No Need to Queue at Dawn

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. November grants pay earlier than usual. Older Persons grants are paid on Friday 30 October, Disability grants on 2 November, and Child Support and other grants on 3 November. Grants still under review are paid on 5 November. The money…

    27 October 2026
  • NSFAS 2027 applications close on 31 October — SASSA households, apply now

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. NSFAS applications for the 2027 academic year close on Friday 31 October 2026, and no extension is expected. If your household receives a SASSA grant, your child already passes the NSFAS financial eligibility test — but they still have to…

    25 October 2026

About Guest

Previous Post:Educor colleges closure a blow to private higher education (and landlords)
Next Post:Motorists urged to prioritise safety ahead of Easter weekend

Reader Interactions

Comments

  1. Bourbon Mirage

    13 September 2026 at 7:49 am

    You don’t need a parachute to skydive, but you will need one if you want to do it twice.

  2. black firefly

    4 September 2026 at 4:49 pm

    In Toronto I saw a bumper sticker on a parked car that read: \”I miss South Africa.\” So I broke the window, took the radio and left a note that read: \”I hope this helps.\”

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online