• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Business / Unplanned Outages Have Dropped by 6.6% Year-On-Year

Unplanned Outages Have Dropped by 6.6% Year-On-Year

21 March 2025 by Guest

Friday, 21 March 2025: Eskom confirms that loadshedding remains suspended. The power system remains constrained but stable and supported by the strategic utilisation of emergency reserves to meet demand, especially during peak periods, and where necessary. The Unplanned Capacity Loss Factor (UCLF), or unplanned outages, for the financial year-to-date, stands at 25.77%, improving from 32.39%…

Friday, 21 March 2025: Eskom confirms that loadshedding remains suspended. The power system remains constrained but stable and supported by the strategic utilisation of emergency reserves to meet demand, especially during peak periods, and where necessary.

The Unplanned Capacity Loss Factor (UCLF), or unplanned outages, for the financial year-to-date, stands at 25.77%, improving from 32.39% in the same period last year. This reflects a ~6.6% reduction and signifies increased fleet reliability.

As of today, unplanned outages slightly increased to 13 733MW compared to the previous week, while available generation capacity is 27 106MW, sufficient to meet tonight’s forecasted peak demand of 25 652MW.

Eskom continues to maintain high levels of planned maintenance as part of its efforts to improve fleet reliability in preparation for the high winter demand, while also meeting environmental license conditions and regulatory requirements. This may necessitate the strategic use of emergency reserves, particularly during morning and evening peak periods. Currently, planned maintenance stands at 6 793MW.

Year-to-date (1 April 2024 to 21 March 2025), electricity supply was available ~96% of the time, compared to just ~ 9% last year and loadshedding was suspended for 342 days, compared to 32 days in the same period last year.

Year-to-date diesel savings have reached R16.89 billion. This reflects actual spending which is 51.8% less than the R32.61 billion spent during the same period last year.

Eskom’s Summer Outlook from 1 September 2024 to 31 March 2025, published on August 26, 2024, remains unchanged.

Eskom is on course to return an additional 2 120MW to service over this long weekend, as previously communicated, to further stabilise the grid.

Key Performance Highlights:

  • From March 14 to 20 March 2025, average unplanned outages reduced to 12 878MW, showing an improvement of 1 619MW compared to the same period last year. Year-to-date average unplanned outages stand at 12 344MW, 656MW lower than the summer base case of 13 000MW.
  • The year-to-date Planned Capacity Loss Factor is 12.64%, approximately 0.6% higher than the 12.00% recorded during the same period last year, indicating an increase in planned maintenance activities.
  • The weekly Energy Availability Factor (EAF) increased from 57.0% at the start of the financial year to 58.34% from 17 to 20 March 2025. The year-to-date EAF stands at 60.98%, an improvement of approximately 6.5% compared to the same period last year (54.53%), indicating higher availability of generation capacity.
  • Year-to-date Eskom spent approximately R15.72 billion on fuel for the OCGT fleet, which is below budget, generating 2 645.43GWh. This is significantly lower than the 5 047.93GWh generated during the same period last year.
  • The OCGT load factor from 14 to 21 March 2025 was higher at 23.62% compared to last year’s figure of 19.37%. However, OCGT load factor year-to-date stabilised at 9.12%, compared to last year’s figure of 17.35%.

‘Save Your Transformers, Save Lives’ campaign

While loadshedding is currently suspended, Eskom appeals to the public to avoid illegal connections, to buy electricity only from Eskom-accredited vendors and help protect the power network by reporting any illegal activities to the Eskom Crime Line at 0800 112 722 or via WhatsApp at 081 333 3323.

We will provide an update on Friday, 28 March 2025, or promptly communicate any significant changes as soon as they occur.

Courtesy of Eskom

About Eskom and Electricity – Partnerships: Collaborates with international organizations for energy projects and research.

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: BusinessTag: Electricity, Energy, Eskom

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Older Persons Grants Land Today — No Need to Queue at Dawn

    Dear Editor, Older Persons grants are paid today, 30 October, under SASSA’s revised November payment schedule — with disability grants on Monday 2 November, children’s grants on Tuesday 3 November, and grants under review on Thursday 5 November. Two things every beneficiary should know. First, grant money does not expire on payment day. It stays…

    30 October 2026
  • November Grants Pay Early – No Need to Queue at Dawn

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. November grants pay earlier than usual. Older Persons grants are paid on Friday 30 October, Disability grants on 2 November, and Child Support and other grants on 3 November. Grants still under review are paid on 5 November. The money…

    27 October 2026
  • NSFAS 2027 applications close on 31 October — SASSA households, apply now

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. NSFAS applications for the 2027 academic year close on Friday 31 October 2026, and no extension is expected. If your household receives a SASSA grant, your child already passes the NSFAS financial eligibility test — but they still have to…

    25 October 2026

About Guest

Previous Post:Open Book Youth Fest Kicks off in Langa
Next Post:Event Info: Kesivan & The Lights – ‘Freedom in Sound’ Tour

Reader Interactions

Comments

  1. Fuzzy Rainbow

    2 September 2026 at 9:23 am

    Zuko Tisani founded Legazy Technology Conferencing that helps technology start-ups exhibit their talents on a global scale through platforms such as Web Summit. This enables them to reach their peers and sell their technology ideas to the right people at an affordable rate. Legazy is now a subsidiary of the By Design Communications Group. It was acquired after Tisani managed to secure a USD1 million letter of intent from one of Africa\’s largest TMT (technology, media, telecom) companies for the hosting of a new Web summit conference in South Africa in 2018. He is also part of the world\’s top 350 handpicked entrepreneurs in the world under 25, according to the Kairos Global Society.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online