• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Immediate Independent Investigation Demanded Into Repeated Failures to Repair Critical R40 Route

Immediate Independent Investigation Demanded Into Repeated Failures to Repair Critical R40 Route

19 January 2026 by Guest

It has been three years since the heavy rainfall of February 2023 severely damaged the R40 road between White River and Hazyview, and repeated attempts to repair it have all failed. This road is of strategic importance to Mpumalanga’s economy as it is one of the main access routes of the Kruger National Park, and […]

The post VF Plus demands immediate independent investigation into repeated failures to repair critical R40 route appeared first on Freedom Front Plus.

It has been three years since the heavy rainfall of February 2023 severely damaged the R40 road between White River and Hazyview, and repeated attempts to repair it have all failed.

This road is of strategic importance to Mpumalanga’s economy as it is one of the main access routes of the Kruger National Park, and is meant to ensure safe transport for Mbombela residents, farmers and businesses.

After three years of waiting and millions in taxpayers’ money, it is simply unacceptable that the road surface keeps giving way shortly after being repaired.

SANRAL, which recently took over the responsibility of repairing roads from the Mpumalanga province, blames “excessive rain” for the latest damage to the road.

The Freedom Front Plus (VF Plus), however, closely monitored the preceding repairs and can confirm that the recent road damage cannot be attributed solely to the heavy rains.

The road surface had already cracked along the length of the repaired sections before the rain began, while the detours – which had been exposed to the same rain and traffic, and are lower lying with more water run-off – remain intact and structurally stable.

This points to serious flaws in the construction process, including insufficient compaction of the foundation and poor quality control. The work of the contractor and/or site engineer is brought into question.

The Freedom Front Plus, therefore, insists that a neutral engineer immediately be called in to conduct an independent inspection to determine the actual causes of the failed repairs.

No variation orders for further repair work should be approved until such an inspection has been conducted.

Should the contractor be found liable, the repairs should be paid for with money from the retention fund, which the state contractually withholds, and not tax money.

In addition, the contractor should disclose the name of the site engineer to rule out any possible conflicts of interest.

The Freedom Front Plus will request its MP in the National Council of Provinces (NCOP) to ensure that the national and provincial authorities prioritise this matter and guarantee full transparency.

Taxpayers deserve a safe, durable road reflecting the economic importance of the route.

The Freedom Front Plus will keep the pressure on until this critical route has been permanently fixed and those responsible have been brought to book.

Freedom Front Plus Disaster Management: The party advocates for effective disaster management strategies.

Read More at the Source

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: CAN, critical, Freedom Front Plus, Money, Mpumalanga, ONE, Politics, SANRAL, Water

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Older Persons Grants Land Today — No Need to Queue at Dawn

    Dear Editor, Older Persons grants are paid today, 30 October, under SASSA’s revised November payment schedule — with disability grants on Monday 2 November, children’s grants on Tuesday 3 November, and grants under review on Thursday 5 November. Two things every beneficiary should know. First, grant money does not expire on payment day. It stays…

    30 October 2026
  • November Grants Pay Early – No Need to Queue at Dawn

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. November grants pay earlier than usual. Older Persons grants are paid on Friday 30 October, Disability grants on 2 November, and Child Support and other grants on 3 November. Grants still under review are paid on 5 November. The money…

    27 October 2026
  • NSFAS 2027 applications close on 31 October — SASSA households, apply now

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. NSFAS applications for the 2027 academic year close on Friday 31 October 2026, and no extension is expected. If your household receives a SASSA grant, your child already passes the NSFAS financial eligibility test — but they still have to…

    25 October 2026

About Guest

Previous Post:AL ATTIYAH TAKES SIXTH DAKAR CAR WIN | SA News
Next Post:Knysna Water Crisis

Reader Interactions

Comments

  1. Freeway

    5 September 2026 at 6:43 pm

    Switzerland: You have two cows. Neither belong to you.

  2. Nightdream

    30 August 2026 at 7:38 pm

    What\’s the difference between an ANC MP and a flying pig?

    The letter F.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online