• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / The Generator Broke, Leaving This Village Without Water — 17 Years Ago

The Generator Broke, Leaving This Village Without Water — 17 Years Ago

20 January 2026 by Guest

Residents who can’t afford to buy water have to get it from a faraway river

Villagers in Sicwenza walk more than a kilometer, crossing hills, to collect buckets of water because the area has not had running water for years.

  • Six villages in Sicwenza outside Flagstaff in the Eastern Cape have gone without water for 17 years.
  • Residents collect water from a nearby river shared with cattle and other animals. Those who can afford it buy water, spending about R1,500 for 2,500 litres.
  • The community’s water supply is meant to come from the Ludiwane Water Treatment Works under the Mzintlava River Scheme, which began in 2024. But delays with construction have halted these efforts.

Hundreds of residents from six villages in Sicwenza outside Flagstaff in the Eastern Cape have gone without running water for 17 years.

Villagers say problems started in 2009 when a generator for a borehole that supplied the area was removed by municipal officials after it broke down. It was never returned. They complain that their pleas for the generator to be returned have been ignored for years.

When we visited the borehole site, it was filled with water, but the generator storeroom was empty and badly vandalised. Doors had been stolen and pipes were broken.

Villages affected include Sicwenza, Mangquzu, Khimbili, Ngqwabeni, Mission and KwaNdayeni. Residents there now rely on collecting water from a nearby river shared with cattle and other animals. Those who can afford to, spend about R1,500 for 2,500 litres of water.

Resident Yandisa Mtshoqolwana said, “We have gone back and forth to the municipality seeking an intervention, but nothing has been resolved.”

“They are all aware of what’s happening here. Our ward councillor is never available when we need him. We are sharing dirty water with animals,” he said.

Farmer Mphuthani Miya said the lack of water has made daily life extremely difficult, forcing residents to stop planting their own maize and vegetables. “We used to farm on our amasimi (fields) to feed our families, but now we spend our small social grants buying vegetables,” he said. “I’m old and crippled. I cannot carry containers from the river, so I depend on my grandchildren to fetch me water.”

The community’s water supply is meant to come from the Ludiwane Water Treatment Works under the Mzintlava River Scheme, which began in 2024, according to ward councillor Bongani Nokhele. But delays with construction have halted these efforts.

He added that water will be provided to residents on request, particularly for funerals.

Sicwenza borehole has a good supply of water but no generator to pump to the community taps.

OR Tambo District Municipality spokesperson Ncebakazi Kolwane acknowledged that there were “long-standing water supply challenges” in the area. The broader challenge stems from historical bulk water infrastructure backlogs, she said.

According to Kolwane, the villages were previously supplied through a spring water scheme from a reservoir that flowed into communal taps. She said this system was repeatedly hit by vandalism for several years, which ultimately rendered it inoperable.

Kolwane said the generator was later installed and used to pump water but it was stolen while the municipality was in the process of replacing parts damaged by vandalism. However, residents dispute the municipality’s account, insisting that the generator was removed by municipal officials driving a municipal truck.

Kolwane said the bulk water project is currently supplying about 40% of villages in the Ingquza Hill Local Municipality and has the capacity to supply more than 60% once complete.

She said Sicwenza has already been connected to the Ludiwane Water Treatment Works system, but there is still outstanding work needed to pump water into existing reservoirs and taps. She said construction was at times disrupted by community protests and vandalism, requiring sections of the project to be restarted.

“The municipality notes the frustrations of the Sicwenza community and reiterates its commitment to addressing water service challenges through temporary relief measures and long-term infrastructure development,” she said.

© 2026 GroundUp. This article is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

You may republish this article, so long as you credit the authors and GroundUp, and do not change the text. Please include a link back to the original article.

We put an invisible pixel in the article so that we can count traffic to republishers. All analytics tools are solely on our servers. We do not give our logs to any third party. Logs are deleted after two weeks. We do not use any IP address identifying information except to count regional traffic. We are solely interested in counting hits, not tracking users. If you republish, please do not delete the invisible pixel.

The #ProtectOurWildlife campaign raises awareness about poaching and conservation efforts in South Africa.

Read More at the Source

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: 2024, CAN, challenge, community, Eastern Cape, GOOD, GroundUp, infrastructure, officials, Running, Social Grants, Water

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Older Persons Grants Land Today — No Need to Queue at Dawn

    Dear Editor, Older Persons grants are paid today, 30 October, under SASSA’s revised November payment schedule — with disability grants on Monday 2 November, children’s grants on Tuesday 3 November, and grants under review on Thursday 5 November. Two things every beneficiary should know. First, grant money does not expire on payment day. It stays…

    30 October 2026
  • November Grants Pay Early – No Need to Queue at Dawn

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. November grants pay earlier than usual. Older Persons grants are paid on Friday 30 October, Disability grants on 2 November, and Child Support and other grants on 3 November. Grants still under review are paid on 5 November. The money…

    27 October 2026
  • NSFAS 2027 applications close on 31 October — SASSA households, apply now

    Dear Editor, I run SAGrant (sagrant.co.za), a free resource helping South Africans navigate SASSA grants. NSFAS applications for the 2027 academic year close on Friday 31 October 2026, and no extension is expected. If your household receives a SASSA grant, your child already passes the NSFAS financial eligibility test — but they still have to…

    25 October 2026

About Guest

Previous Post:SA U19 Men Set up Record Victory
Next Post:#HandsOffXolani: Xolani Khumalo Fought for South Africa, Now We Must Fight for Him | SA News

Reader Interactions

Comments

  1. Pepper Prada

    2 October 2026 at 4:33 pm

    Fun South African Fact: For an unforgettable bucket-list activity, search for the famous Big 5 (lion, leopard, elephant, rhino and buffalo) on safari in one of South Africa’s national parks or private game reserves. A South African safari is an experience like no other!

  2. Silver Cup

    19 September 2026 at 12:06 pm

    Van, startled, spins around and answers the rep, \”It\’s my donkey\’s ears. When they walk under the highway their ears rub along the roof and hurt them. I\’m making it taller so that doesn\’t happen\”.

    The rep looking confused, because it\’s a dirt track that runs under the bridge, asks him, \”Why don\’t you grade or dig some of the soil to lower the surface so they can pass through without their ears touching?\”

    Van – no the one looking confused then angry answers, \”No man, it\’s their ears that are too long, not their legs!\”

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online