• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / Tugboats to improve services at Transnet’s Port of East London 

Tugboats to improve services at Transnet’s Port of East London 

5 September 2024 by Guest

Tugboats to improve services at Transnet’s Port of East London 

The Port of East London on Thursday received the two last tugboats marking the completion of Transnet National Ports Authority’s (TNPA) R1billion investment towards the Marine Fleet Renewal Programme.

The programme is aimed at boosting tugboat availability and enhancing shipping operations.

The programme is a key element of the Transnet Recovery Plan which is critical in driving shipping efficiencies and reliability, whilst also positioning the ports as competitive and a catalyst for economic growth. 

The tugboats are designed to provide marine services including the safe navigation of vessels, pilotage, towage and waterside pollution combat.

The two tugs delivered by Damen Shipyards Cape Town (DSCT) replace the existing tug fleet that has reached its operational lifespan at the Port of East London in the Eastern Cape.

The latest tugs comprising modern technology solutions are built with an azimuth stern drive and have an improved bollard pull of 60-tonnes compared to the 43-tonnes bollard pull on the existing tugs.
The procurement of the tugs serves as a catalyst for the port’s expansion plan.

The plan also includes the deepening and strengthening of the port’s automotive berth to address berthing challenges. 

The project hit a significant milestone in November 2023 with the commencement of the concrete works package. 

Also included in the river port’s expansion plan is the delivery of two jib cranes for the port’s dry dock facility, which will increase the ship repair facility’s capacity and volume throughput in the 2024/25 financial year.

Strategic projects

The advanced features of the two new tugs will enable the port to respond to the anticipated shipping and volume demands.

“The journey towards the full recovery of Transnet lies in our commitment to growth and investing in fit-for-purpose equipment,” said Transnet Board Chairperson, Andile Sangqu who spoke during the tug naming and christening ceremony held at the port.

“This acquisition is a crucial investment towards creating a sustainable port system and will enable the execution of strategic projects currently underway at the Port of East London,” Sangqu said.

Recovery Plan

Sangqu said Transnet is currently executing a number of actionable steps to halt the decline in operational and financial performance through the Transnet Recovery Plan launched in October 2023.

“The Recovery Plan directs us to prioritise revitalising our ageing marine assets in order to improve operational efficiency and serve our customers better. Investing in port infrastructure to drive efficiency and reliability is a catalyst for improved economic competitiveness. 

“Ports are the lifeblood of trade, the gateways through which goods flow in and out of our economy,” Sangqu said.  

Lentswe and Kganya

At the christening ceremony, tug Lentswe meaning “the voice of sailors” was unveiled by Transnet Board Member, Boitumelo Sedupane in her role as the tug’s Lady Sponsor, while tug Kganya meaning “light” and symbolising guidance in safe navigation of vessels, was revealed and christened by TNPA Board Member Valda Gossman. 

The names of the tugs were chosen through a naming competition run among TNPA employees.

The two tugs are in addition to the five tugs which were delivered at the Port of Durban last month.

“We are proud to have delivered these tugboats for TNPA. The vessels represent a substantial investment in our maritime infrastructure and will contribute to local job creation and skills development as DSCT will provide all operational support, including spares, repairs, and services,” said Sefale Montsi, Director at Damen Shipyards Cape Town.

“Through a centralised system, the vessel will provide data-driven insight for timely information on ship operations,” she said. 

Attracting investors

 Eastern Cape acting Premier Mlungisi Mvoko said the acquisition of the two tugboats is part of enhancing operations at the Port of East London.

“Today’s milestone aligns with our strategic view that our ports are the biggest instruments for attracting investors in the province,” Mvoko said.

Mvoko said the province is pleased with TNPA’s investment in boosting tugboat availability and shipping efficiencies at the port.

“Our customers in this port are set to benefit from the improved capacity in the new tugboats when compared to the existing maritime crafts that have reached their lifespan. We believe that this will have positive impact on the container vessel turnaround time and ultimately increase efficiencies and productivity at the port. 

“It is these efficiencies that we will leverage on to increase our economic activities in areas of the automotive sector and agriculture, our two main economic drivers in the Eastern Cape.

“We are trying very hard to lure as many investors to the province as we can. It is the only way we can deal with the high rate of unemployment. All customers in this port are set to benefit from the improved capacity in the new tugboats when compared to the existing maritime crafts that have reached their lifespan,” the acting Premier said.

The delivery of the fleet is part of TNPA’s R1 billion investment in boosting tugboat availability and shipping efficiencies in the South African seaports.

From the acquisition, the Port of Durban has been allocated five tugboats while two tugs have been allocated to the Port of East London. – SAnews.gov.za 

Edwin
Thu, 09/05/2024 – 13:29

163 views

The Port of East London on Thursday received the two last tugboats marking the completion of Transnet National Ports Authority’s (TNPA) R1billion investment towards the Marine Fleet Renewal Programme.

The programme is aimed at boosting tugboat availability and enhancing shipping operations.

The programme is a key element of the Transnet Recovery Plan which is critical in driving shipping efficiencies and reliability, whilst also positioning the ports as competitive and a catalyst for economic growth. 

The tugboats are designed to provide marine services including the safe navigation of vessels, pilotage, towage and waterside pollution combat.

The two tugs delivered by Damen Shipyards Cape Town (DSCT) replace the existing tug fleet that has reached its operational lifespan at the Port of East London in the Eastern Cape.

The latest tugs comprising modern technology solutions are built with an azimuth stern drive and have an improved bollard pull of 60-tonnes compared to the 43-tonnes bollard pull on the existing tugs.
The procurement of the tugs serves as a catalyst for the port’s expansion plan.

The plan also includes the deepening and strengthening of the port’s automotive berth to address berthing challenges. 

The project hit a significant milestone in November 2023 with the commencement of the concrete works package. 

Also included in the river port’s expansion plan is the delivery of two jib cranes for the port’s dry dock facility, which will increase the ship repair facility’s capacity and volume throughput in the 2024/25 financial year.

Strategic projects

The advanced features of the two new tugs will enable the port to respond to the anticipated shipping and volume demands.

“The journey towards the full recovery of Transnet lies in our commitment to growth and investing in fit-for-purpose equipment,” said Transnet Board Chairperson, Andile Sangqu who spoke during the tug naming and christening ceremony held at the port.

“This acquisition is a crucial investment towards creating a sustainable port system and will enable the execution of strategic projects currently underway at the Port of East London,” Sangqu said.

Recovery Plan

Sangqu said Transnet is currently executing a number of actionable steps to halt the decline in operational and financial performance through the Transnet Recovery Plan launched in October 2023.

“The Recovery Plan directs us to prioritise revitalising our ageing marine assets in order to improve operational efficiency and serve our customers better. Investing in port infrastructure to drive efficiency and reliability is a catalyst for improved economic competitiveness. 

“Ports are the lifeblood of trade, the gateways through which goods flow in and out of our economy,” Sangqu said.  

Lentswe and Kganya

At the christening ceremony, tug Lentswe meaning “the voice of sailors” was unveiled by Transnet Board Member, Boitumelo Sedupane in her role as the tug’s Lady Sponsor, while tug Kganya meaning “light” and symbolising guidance in safe navigation of vessels, was revealed and christened by TNPA Board Member Valda Gossman. 

The names of the tugs were chosen through a naming competition run among TNPA employees.

The two tugs are in addition to the five tugs which were delivered at the Port of Durban last month.

“We are proud to have delivered these tugboats for TNPA. The vessels represent a substantial investment in our maritime infrastructure and will contribute to local job creation and skills development as DSCT will provide all operational support, including spares, repairs, and services,” said Sefale Montsi, Director at Damen Shipyards Cape Town.

“Through a centralised system, the vessel will provide data-driven insight for timely information on ship operations,” she said. 

Attracting investors

 Eastern Cape acting Premier Mlungisi Mvoko said the acquisition of the two tugboats is part of enhancing operations at the Port of East London.

“Today’s milestone aligns with our strategic view that our ports are the biggest instruments for attracting investors in the province,” Mvoko said.

Mvoko said the province is pleased with TNPA’s investment in boosting tugboat availability and shipping efficiencies at the port.

“Our customers in this port are set to benefit from the improved capacity in the new tugboats when compared to the existing maritime crafts that have reached their lifespan. We believe that this will have positive impact on the container vessel turnaround time and ultimately increase efficiencies and productivity at the port. 

“It is these efficiencies that we will leverage on to increase our economic activities in areas of the automotive sector and agriculture, our two main economic drivers in the Eastern Cape.

“We are trying very hard to lure as many investors to the province as we can. It is the only way we can deal with the high rate of unemployment. All customers in this port are set to benefit from the improved capacity in the new tugboats when compared to the existing maritime crafts that have reached their lifespan,” the acting Premier said.

The delivery of the fleet is part of TNPA’s R1 billion investment in boosting tugboat availability and shipping efficiencies in the South African seaports.

From the acquisition, the Port of Durban has been allocated five tugboats while two tugs have been allocated to the Port of East London. – SAnews.gov.za 


Watch a Tugboats to improve services at Transnet’s Port of East London  related video:

Have you visited MyPR?

MyPR.co.za offers free to publish press releases for your news site, blog or offline publication. Use the handy REPUBLISH facility or the Full Text RSS Feeds or just copy and paste.

Straton Electrical | Straton Solar | Straton Prepaid | Straton Plumbing | Straton IoT | Straton eBikes | BA Systems | Mbane Contracting | Reach Trust

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: 2024, African, agriculture, Cape Town, critical, data, Durban, East London, Eastern Cape, infrastructure, Investing, new, SA News, Skills Development, solutions, Technology, Video

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Congratulations to the Lotto Winner

    Dear Editor Dear Editor, I was thrilled to hear about the R8.5 million Lotto win for the community of Gqeberha. Such life-changing news brings hope and excitement to everyone in the area. I congratulate the winner and wish them all the best with their prize. May this bring positive change to their life and the…

    1 October 2026
  • Opinion on Lotto Winner News

    Dear Editor Congratulations to the lucky winner! This is truly wonderful news for the community. Regards Marina Adams In Response to/From: Congratulations to the Lucky Winner

    1 October 2026
  • Regarding Lotto Winner Story

    Dear Editor Congratulations to the winner, this is wonderful news for the community. Wishing them the best for the future. Regards Willem Pieterse In Response to/From: Re: R8.5 Million Lotto Winner Claims Prize in Gqeberha

    27 September 2026

About Guest

Previous Post:Over one thousand permits issued for hemp cultivation
Next Post:Air Traffic Failures Threatening South Africa’s Tourism and Economy

Reader Interactions

Comments

  1. Teeder

    7 September 2026 at 9:45 am

    Thanks for this article – it has opened my eyes to the possibilities in my life.

  2. romance princess

    26 August 2026 at 1:52 pm

    Fun South African Fact: South African Dr. Christiaan Barnard performed the world’s first heart transplant on 3 December 1967 at Groote Schuur Hospital in Cape Town. The groundbreaking surgery was carried out on Louis Washkansky and Dr. Barnard was assisted by a large and exceptional team of surgeons, nurses and technicians. One of Dr. Barnard’s assistants was Hamilton Naki, a black laboratory assistant who had worked previously as a gardener and went on to work in the animal laboratory at the University of Cape Town. He had assisted Dr Barnard with research leading to the transplant. In the apartheid days, Naki had no access to higher education due to his race. Despite being unable to access formal training, he learned from and assisted university researchers and went on to do astonishing work.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online