• Skip to main content
  • Skip to header right navigation
  • Skip to after header navigation
  • Skip to site footer
MyZA

MyZA

News, Directory, Events and Other Stuff

  • Social Media
  • Sport
  • World News
  • Home
  • Submit News
  • Directory
  • Events
  • Stratlec
  • TFSA
  • News
    • APO
    • Today’s Sport News
    • Todays Social Media and Tech Headlines
    • Today’s World News
    • Today’s SA Financial News
  • Contact
You are here: Home / News / R25-Million and 7 Years Later, Indwe Sports Field Far From Finished

R25-Million and 7 Years Later, Indwe Sports Field Far From Finished

25 July 2025 by Guest

It was meant to take 18 months, and now another R10-million is needed

The rehabilitation of a sports field in Indwe, rural Eastern Cape, was initially meant to take 18 months. But seven years and at least R25-million later, Emalahleni Local Municipality is planning to spend another R10-million on a third contractor to finish the project.

In July 2018, an R11-million tender was awarded to MBS Civils JV Cudjor Quantity Surveying to rehabilitate the Indwe sports field. But after eight months and R10-million spent, the contractor abandoned the site.

Eastern Cape Hawks spokesperson Ndiphiwe Mhlakuvana said an investigation into the matter is at an advanced stage.

In 2023, the new tender was awarded to MVI Construction & Maintenance for just under R15-million and to Masilakhe Consulting for R2.6-million. Work started in March 2023 and was meant to take a year. It included demolishing an existing building, creating a 90x120m sports field, an eight-lane athletics track, change rooms and toilets, outdoor gym, kids area, soccer and rugby posts, and a netball/basketball court.

According to municipality spokesperson Luthando Nqumkana, the remaining work includes final touches, painting, electrical wiring, water and sewer connections, and asphalting the track.

But when we visited, no contractor was on site. We found the changing rooms without windows and doors. The sports field is incomplete. There is no netball court or outside gym.

Nqumkana said the national sports department has allocated R10-million for what is now being called “phase two” – including a synthetic running track, grandstand, guardhouse, fencing, parking, children’s playing area and flood lighting.

Community leaders said there was never mention of a “phase two” before. Thabo Khethi said, “We no longer ask questions … We are not getting any answers from officials.”

“What shocked us most was to be told that another R10-million is put aside for this,” said Khethi.

Civil society organisation Siyazidla nge Khayalethu (Indwe) chairperson Jane Smith said, “We are frustrated because we want that sports field to be done, so our children can play in a safe area.”

The organisation’s secretary, Ayanda Khogolo, said they’ve waited since February for the ward councillor to report back.

Nqumkana said delays were caused by bad weather, excessive earthworks needed due to unsuitable material, an Eskom line crossing the field, Telkom manholes, and a bulk waterline that had to be relocated.

“These challenges led to the revision of designs. As a result, time was lost,” he said.

The change rooms are without windows.

© 2025 GroundUp. This article is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

You may republish this article, so long as you credit the authors and GroundUp, and do not change the text. Please include a link back to the original article.

We put an invisible pixel in the article so that we can count traffic to republishers. All analytics tools are solely on our servers. We do not give our logs to any third party. Logs are deleted after two weeks. We do not use any IP address identifying information except to count regional traffic. We are solely interested in counting hits, not tracking users. If you republish, please do not delete the invisible pixel.

Soil erosion: Loss of topsoil due to erosion.

Read More at the Source

Share this:

  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Print (Opens in new window) Print
  • Email a link to a friend (Opens in new window) Email
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Mastodon (Opens in new window) Mastodon
Category: NewsTag: Athletics, Basketball, CAN, children, Civil Society, community, Eastern Cape, Eskom, GroundUp, kids, march, Netball, new, officials, Rugby, Running, Soccer, Sports, Stage, Water

If you feel strongly about this article then feel free to send MyZA a ‘Letter to the Editor’ using the submission form below:


Letter to the Editor

This field is for validation purposes and should be left unchanged.
If this is in response to an article please include that article title here or as the lead in for the first paragraph of your Letter below.

Separate tags with commas

Localise your letter by naming the city your words are about. Add relevant words describing your subject. Single comma separated words of no more than 5
Your Name(Required)
Your Name will be linked to the website below.
Your personal, business or social media web site
Choose NO to not set up a user account on MyZA. User Accounts will allow you to submit letters under your own Author Name

3 Latest Letters to the Editor:

  • Re: R8.5 Million Lotto Winner Claims Prize in Gqeberha

    Dear Editor This is indeed an exciting story for the community. Congratulations to the winner and may this bring positive change to Nomathamsanqa. As someone from KwaMashu, I understand the impact such winnings can have on township communities. Wishing the grandfather all the best. Regards Themba Zulu In Response to/From: R8.5 Million Lotto Winner Claims…

    18 September 2026
  • Re: Minister Tolashe and Postbank Black Cards

    Dear Editor I appreciate the Minister’s assurance regarding the smooth transition to Postbank Black Cards for grant beneficiaries. As a concerned citizen, I hope the government will ensure that all beneficiaries, especially elderly and vulnerable populations in areas like Soweto, receive adequate assistance during this transition period. The expansion of card replacement locations to include…

    18 September 2026
  • Lotto Winner Story

    Dear Editor This is indeed an exciting story for the community. Congratulations to the winner and may this bring positive change to Nomathamsanqa. Regards Willem Pieterse In Response to/From: R8.5 Million Lotto Winner Claims Prize in Gqeberha

    16 September 2026

About Guest

Previous Post:Uber South Africa makes improvements for disabled riders – Hypertext | SA News
Next Post:New Opel Mokka launched in South Africa – Pricing and features | SA News

Reader Interactions

Comments

  1. Sky Trinity

    5 September 2026 at 1:29 pm

    Fun South African Fact: Can you think of any other place in the world where two Nobel Peace Prize winners lived on the same street? Both Nelson Mandela and Archbishop Desmond Tutu had houses on Vilakazi Street in Soweto.

Copyright © 2026 · MyZA · All Rights Reserved · Powered by Stratlec Online